Our facilities
Dubai Maritime City (DMC) Shipyard
At our main production facility, we can repair over 30 vessels simultaneously. State-of-the-art facilities at our DMC Shipyard encompass a 6000-ton ship lift with 130m x 35m, a 3000-ton ship lift with 90m x 25m, a 720-ton capacity boat hoist, and 31 docking berths. With over 55,000 square meters of space, our facilities are the largest in Dubai Maritime City and enable us to build over 30 vessels simultaneously.
Our facilities include:
A 30,000 sqm main building and production facilities consisting of:
- 13,500 sqm covered and insulated space with overhead cranes
- 8000 sqm open yard
- 4000 sqm modern offices
- CNC workshop
- Piping workshop
- 20,000 sqm outfitting and assembly yard for shipbuilding
- 5,000 sqm storage yard
13500
 sqm
Covered Yard
8000
 sqm
Open Yard
4000
 sqm
Modern Offices